Considered specifications. Better decisions.

Interior Door Packages for Fit-Out Projects

Coordinate interior door packages with room references, frame and leaf construction, wall thickness, finish schedules and installation sequencing.

Interior frame and wall alignment detail

Interior contractor

Make repeated openings easy to identify.

A room-by-room package that preserves exceptions, installation sequence and finish approvals.

Bring to the discussion

  • Room references and repeated door types
  • Wall thickness, floor finish and handing
  • Core, face, edge and hardware-set references
Explore the planning guide
  1. 01

    Group the rooms

    Separate identical types from handing or wall-thickness variants.

  2. 02

    Detail the frame

    Coordinate concealed junctions and the sequence of wall finishing.

  3. 03

    Approve the set

    Review leaf construction, finish and hardware as one configuration.

  4. 04

    Label for site

    Keep room references on assemblies, loose hardware and packing records.

Interior fit-out packages often contain many doors that look similar but meet different room, wall and hardware requirements. A reliable schedule makes these differences visible before ordering. It also helps installers find the correct package and reduces the chance that a revised opening is missed across repeated room types.

Organize by room and door type

Assign each opening a location reference, then group genuinely identical configurations under a door type. Record quantities, clear opening requirements, wall thickness, finished floor level, handing, frame arrangement and hardware preparation. Keep bathroom, utility and circulation requirements explicit rather than assuming one configuration suits every room.

The door schedule template supports this process. If a room layout repeats, identify the repeated set and any exceptions; do not hide opposite handing inside a single unqualified quantity.

Separate frame, leaf and surface decisions

Layer What the schedule should identify
Frame Material, visible or concealed arrangement, wall interface and finish
Leaf construction Core, perimeter construction, thickness and applicable size limits
Surface Veneer, laminate, paint or another confirmed finishing system
Hardware Hinges, locks, handles, closer requirements and preparation
Perimeter Seals, thresholds or floor clearances as applicable to the reviewed system

An aluminum frame with a wooden leaf is a different construction from an aluminum-skinned leaf. Likewise, “flush” describes an appearance or alignment relationship, while concealed frame details require specific coordination with the wall finish. Use precise terms in the inquiry.

Review interfaces before the finish schedule

Check how frames meet partitions, plaster, wall panels and floors. Agree when components need to arrive relative to wall finishing and decoration. Where hidden frames are proposed, the responsible installation team should review fixing, setting-out and finishing details before work is covered.

Performance requirements must be stated separately for relevant openings. A solid core or a particular frame material does not, by itself, demonstrate the performance of the complete installed door set.

Keep packages and revisions traceable

Use the room and door references on drawings, approvals and packing labels. Record changes to quantities, handing and finish as a revised schedule. Discuss batch deliveries, site storage and identification of loose hardware before confirming the supply package.

Send the project country, schedule, wall details and target sequence through Request a Quote. For material selection, review the interior door material comparison. Availability, sampling, quantities and delivery arrangements are established for the actual order.

Separate repeated rooms from exceptional openings

A repeated room layout can still contain different wall thicknesses, handing or finishes. Mark those differences as variants and reconcile quantities by floor before approving production. Link loose hardware to the same room or type reference so a shared crate does not obscure which set belongs at each opening.

Review the interior frame and system options alongside the wooden door constructions. The multi-unit scheduling guide provides a method for keeping type codes, opening identities and quantity totals consistent.

Let’s talk about your project

Every good door starts with a conversation.

Bring an idea, a drawing or a few opening dimensions. We’ll help you define the next step for your project.

Need a starting point? Get the door schedule.

Specification, price and delivery are confirmed in your written quote.

Project inquiries

Tell us about your project.

Share an idea, a door type or an opening. Drawings and details can follow.

By submitting, you agree that we may use these details to reply. Read our privacy policy.

Your choice

Cookie preferences

Choose whether to allow analytics storage and session analysis. Regional defaults apply until you save a choice. You can change your choice at any time using Cookie Preferences in the footer.

Strictly necessary

Always on

Remembers your privacy choice and supports essential site functions. Browsing and sending an inquiry do not require analytics consent.

Allows campaign attribution and optional Google Analytics and Microsoft Clarity to help us understand page use and interactions. Form entries are excluded from analytics events and masked in session recordings. Google Analytics may send cookieless measurements while analytics storage is off. Advertising storage stays off.