Design intent
Leaf structure, pivot hardware and floor support are considered together.
Exterior & Entrance Doors / Design configuration
A sculptural entrance with a satin bronze design direction and a pivot opening. Define the offset, clear passage and floor interface before the appearance is signed off.
AI-generated design concepts illustrate possible configurations. Confirm the exact construction, finish and hardware in your project specification.
Exterior & Entrance Doors
A sculptural entrance with a satin bronze design direction and a pivot opening. Define the offset, clear passage and floor interface before the appearance is signed off.
Dimensions, materials and supply scope are agreed in your quotation and project drawings.
Designed around the opening
Leaf structure, pivot hardware and floor support are considered together.
Leaf structure, pivot hardware and floor support are considered together.
Pivot offset and opening arc, Plain, fluted or wood-look surface, Pull handle and locking preparation.
Mark both faces of the wall and draw the swing arc, including the portion of the leaf behind the pivot.
Define the assembly
Frame, leaf or panels, finish and hardware must be confirmed as a compatible assembly.
Supporting frameFrame sections, fixings and the interface with the building opening.
Door leafActual metal construction and internal build-up, reviewed by model.
Surface & glazingFinish system and any glass build-up, retention and seals.
Hardware & thresholdHinges or pivot, lock, handle, threshold and installation accessories.
Schematic component relationship. This is not a manufacturing section, dimensioned drawing or performance certificate.
Technical specification
Work through the dimensions, construction and building interface below. Final values are recorded against your selected assembly and approved drawings.
How we approach product evidence| Specification | Details to coordinate |
|---|---|
| Opening width / height | Finished and rough openings with units |
| Leaf size / weight | Full assembly including glazing and hardware |
| Frame section / wall thickness | Profile details, fixings and building interface |
| Pivot / hinge system | Model, fixing detail and allowed loading |
| Threshold / glazing | Floor detail, glass build-up and sealing |
| Surface treatment | Actual coating specification and sample |
| MOQ / lead time | Quantity, configuration and order schedule |
| Performance reports | Requested project criteria and applicable model scope |
Quotation clarity
Every component needs a place in the quotation: included in supply, offered as an option, or provided by others.
Packaging dimensions, gross weight, unloading arrangements and spare-part references are confirmed against the final order.
Plan the building interface
Record sizes, wall thickness, finished floor level, handing and adjacent construction. Identify who checks the site measurements.
Resolve the frame fixing, threshold, leaf clearances and hardware with the actual building detail before production authorization.
Plan unloading, package checks, protected storage and a record of any damage. Use the agreed instructions and support route.
Before you specify
Use the design direction and configuration choices as a starting point. Send your opening schedule, preferred finish and intended use so the exact construction, dimensions, hardware and supply scope can be reviewed and set out in writing.
Send the opening measurements, intended use and site constraints. The proposed size must be reviewed with the actual frame, leaf or panel construction and hardware. Available dimensions are confirmed for your selected configuration in the project quotation.
Share the desired color or wood-look direction and request coordinated physical samples. Different substrates, surface processes, orientations and batches can create visible differences.
The written quotation should list the frame or track system, leaf or panels, glazing, hardware, seals, operator where applicable, accessories and packaging. Each inclusion, option and item supplied by others must be confirmed.
Installation and responsibility for the opening survey are agreed for the project. Use the approved drawings and product-specific instructions; no general worldwide installation service is implied.
Timing, packaging, trade terms, unloading and requested spare parts are set out for the agreed order after specification review. No fixed production or transit period is assumed.
Related configurations
Let’s talk about your project
Bring an idea, a drawing or a few opening dimensions. We’ll help you define the next step for your project.
Need a starting point? Get the door schedule.Specification, price and delivery are confirmed in your written quote.
Project inquiries
Share an idea, a door type or an opening. Drawings and details can follow.